Skip to main content
District

Summer projects across the Oregon Trail School District

Posted Date: 9/13/24 (6:35 PM)

The Oregon Trail School District continued its ongoing focus of maintaining school buildings this summer through a variety of improvements and projects. Many local contractors took part in a wide range of upgrades at every school in the district, including:

  • improved vestibule safety, new paint and parking lot repairs/striping at Boring Middle School.
  • new roofing and replaced HVAC ventilators in the science wing at Cedar Ridge Middle School.
  • new doors (Building B) and upgrades to washbasins (Building D) at Firwood Elementary.
  • dedicated classroom space for Special Education and increased intervention space for staff at Kelso Elementary.
  • additional bottle fills and upgrades to basins at Naas Elementary.
  • new west entrance doors, upgrades to washbasins and fresh paint on doors at Sandy Grade School.
  • new sidewalk improvements along Jewelberry, football field turf replacement and 100 meters of track replacement at Sandy High School.
  • new sidewalk by cafeteria doors and repainted breezeway posts at Welches School.