Completed Capital Improvement Projects 2008-24

Opening
Cedar

 

Oregon Trail School District voters approved a $114.9 million bond levy in 2008 to build a new high school and improve other school facilities. The investment is making a positive difference.

Bond-designated projects completed include:

  • New high school opened in 2012
    • Included a new School Based Health Center; afternoon public health clinic
  • All other schools: 
    • Communication systems improved
      • New phone system, including classroom phones
      • WiFi network throughout, including all classrooms
    • Building security improved
      • Electronic security/card-access to buildings
      • Single button lockdown capability
      • Cameras monitoring security to buildings
      • Single point-of-entry vestibules constructed at every school
      • Perimeter fencing installed around every school
  • Some schools received as needed:
    • Roof and siding repairs
    • Window and door replacement
    • Electrical capacity upgrades
    • HVAC system upgrades

Additional projects completed with residual bond funds:

  • Two additional classrooms built at Naas Elementary to accommodate the growing enrollment
  • Sandy High track replaced
  • Turf fields installed at Sandy High, including:
    • Varsity football field
    • JV baseball and softball infields
    • Varsity baseball and softball infields and outfields
  • CRMS: Home of the Mountaineers!
    • Campus renovations were funded with 2008 bond residuals and interest earnings, the construction excise tax, and the sale of the Cedar Ridge/Aquatic Center property. 

Other major facility/campus projects completed with the district’s general operating budget facility improvement fund:

  • Portable classroom additions at Kelso, Oregon Trail Academy, Naas, and Boring Middle 
  • Perimeter fencing security enhancement at Oregon Trail Academy, Welches campus and Boring Middle School
  • Kelso cafeteria/library renovation
  • Sandy Grade, Naas, and OTA sidewalk improvements 
  • Boring Middle School cafeteria/gym renovation
  • Improved transportation access to alleviate congestion at Firwood Elementary, Boring Middle, Naas Elementary, Welches, and Oregon Trail Academy
  • CTE expansion (classroom/program space) at Cedar Ridge and Boring Middle schools
  • CTE expansion (classroom/program space) at Sandy High for new drone courses
  • Sandy High varsity field turf replacement
  • Cedar Ridge Fitness Center addition (grant funded)
  • Sandy Grade playground enhancements (grant funded)

Our facility maintenance team addresses issues across the district on an ongoing basis, as needs arise and as funds allow. This includes: 

  • HVAC improvements
  • Siding repairs or replacement
  • Lighting upgrades
  • Roof repairs
  • Septic system repairs 
  • Boiler improvements or repairs
  • Masonry improvements
  • Fire system upgrades
  • Door replacements
  • ADA improvements