OTSD schools undergo capital improvements facility assessment

As stewards of our community’s schools, the Oregon Trail School District Board of Directors understands the importance of maintaining the community’s investment in our facilities and campuses. That stewardship includes ongoing facility assessments to help forecast future needs and provide quality learning spaces for students.

 

For more information on how school facilty projects are funded, click here

 

*If you have a question or comment about our school facilities, submit it to julia.monteith@ortrail.k12.or.us

FAQ: 2024 Facilities Assessment & Plan

Communities are known by the schools they keep.

 

Over the past two years, the district has reviewed and discussed school facility maintenance needs, education adequacy, and student safety.

All aspects of the district’s facilities were analyzed, and educational spaces were rated based on their ability to support the district’s educational vision. The result is a Facility Plan developed in collaboration with school staff, parents, and community leaders.

The district considered options for addressing the identified facility needs, including placing a bond measure before Oregon Trail voters.

    • The FAR is a multi-disciplinary on-site inspection of the existing buildings that focuses specifically on architectural, structural, mechanical, electrical, and plumbing systems. It also identifies the cost of deferred maintenance for each school building.
    • Items evaluated include the following:
      • Exterior: walls, foundations, doors, windows, soffits
      • Interior: partitions, floors, ceilings, doors, casework
      • Roof: membrane, drains, downspouts, flashing
      • Structural: rapid assessment of seismic resistance
      • Mechanical, electrical, plumbing (MEP): HVAC, plumbing fixtures, electrical equipment
    • While all the District’s buildings are well-maintained, many have a long list of needs, particularly the older elementary schools. Several buildings are well beyond their practical lifespan.
    • The primary envelope concern district-wide is roofing, with several buildings well beyond their practical life span. Some have active leaks, and some have recent leaks that have been repaired.
    • Nearly every District site, with the exception of Sandy High School and Community Connections, has significant replacement work needed on the existing site water distribution piping. Many of these buildings have original galvanized piping still, which will likely be corroded due to age. There are also issues with plumbing fixtures and a lack of drinking fountains.
    • Sandy Grade and Naas Elementary need improvements to their ADA access.
    • Heating equipment replacement is severe and required at Sandy Grade, Kelso Elementary, and Naas Elementary.
    • Sandy Grade has the most critical electrical issues, with the main service and all sub-panels requiring replacement.
    • A Facility Condition Assessment (FCI) shows a current average of 32% for K-8 buildings across the district. Buildings that rate above 30% are considered in critical need and typically recommended for replacement.
      • With completion of the proposed projects, the average FCI would be reduced to 10%.
  • No. The district is only able to complete minimal facility maintenance/upkeep with limited state funding.

    • Facility assessment: Soderstrom Architects, Fall/Winter 2023/24
    • Facility plan: Soderstrom Architects, Spring/Summer 2024
    • The Superintendent’s Leadership Council, School Board, and district staff began assessing facility needs in early 2018 and resumed the process in 2022.
    • Community survey conducted by Patinkin Research in July 2024.
    • As part of the facility planning process, each school building was analyzed for educational adequacy relative to core academics, elective academics, physical education, support spaces, and overall facility and site functionality.
    • The district started this process by identifying overall goals for each school that would provide parity and equity relative to resources available at each site. The goal is to create a continuity of experience district-wide.
    • The district started this process by identifying overall goals for each school that would provide parity and relative equality of resources available at each site. The goal is to create a continuity of experience district-wide.
  • Our vision is to develop a community school concept at Welches, serving grades K-8, and creating community center options for a generational campus.

  • There are three major facility issues:

    • The facilities are aging and components will fail in the near term.
    • Many of the schools lack core educational spaces like gyms and cafeterias.
    • Classrooms are needed to replace temporary modulars.

    A bond would:

    • protect the community’s investment.
    • provide for equal educational facilities.
    • replace temporary modular classrooms.
  • Bond payments would be structured so residents who move into the community in the future would assist in the payment of the bond.

FAQ: Prior Facility Bonds

2008 Facility Bond

In 2008, the Oregon Trail Community approved a $114.9M bond measure to build a new high school and complete projects at every school across the district.

    • OTSD was a good steward of the 2008 bond funds. Smart fiscal and project management enabled the district to complete all bond-designated projects:
      • A new 306,000 square foot, 21st century Sandy High School.
      • The new school was built to accommodate robust CTE programs of study that align with high wage jobs and industry needs. The school currently offers 8 CTE programs with over 50 course offerings.
      • Every K-8 school district-wide was upgraded with: WiFi network, security cameras, new phone system, electronic security access, and single-button lockdown capability.
      • All schools were upgraded, as needed, with: roof repairs or replacement; siding, window, door replacement; and HVAC system upgrades.
      • Bond residuals and interest earnings allowed OTSD to add these projects: single point of entry vestibules and perimeter fencing at every school; turf fields added and track replaced at Sandy High; and two classrooms added at Naas Elementary to accommodate enrollment growth.
      • OTSD is now known regionally, statewide, and nationally as a frontrunner in implementing school safety and security measures.
    • Smart fiscal and project management enabled the district to complete the bond projects on time and within budget, allowing us to accomplish additional projects that addressed school security, enrollment growth, and student athletics playing fields.
    • A Citizens Bond Oversight Committee monitored expenditures and made sure funds were spent as designated.
    • The district saved taxpayers $10M by refinancing the bond.
    • Bond refinancing, new home construction, and increased home values all contributed to the decreased rate. As our community continues to grow, and new families move into the district, the tax rate decreases for each individual taxpayer.
    • While the Pioneer Campus was not adequate to provide quality education opportunities to our large high school student population, with suitable renovations, it now offers greatly improved education opportunities for our middle school students.
    • Two seriously deteriorated buildings on the Pioneer campus were razed in 2015:
      • The North Building, originally built as a bus barn and used in later years as classrooms, and
      • The old modular building that was behind the school near the tennis courts.
    • The City of Sandy approved a conditional use permit for the campus to serve up to 650 middle school students.
    • Renovations to the main school building began in early spring 2017.
    • The project was technically complex due to its multiple construction types and aged systems. Although the site is a difficult one, it presents a much improved campus for middle school students.
    • Middle school students are benefitting from the increased space and improved features that the Pioneer Campus offers to the instructional program, including new Career & Technical Education (CTE) courses.

2002 Facility Bond

The Oregon Trail Community has a history of supporting its local schools.

Twenty-two years ago, in 2002, voters approved a $1.95M bond to help mitigate the deterioration of school facility systems district-wide. Issues addressed with the bond funds included roof repairs, fire alarm system upgrades, exterior dry rot replacement, electrical system upgrades, and more. Projects were ranked for health and safety considerations and were monitored by a citizens’ oversight committee.

Facilities and Bond Links

  • Click here for more information on the 2008 Bond – how projects were completed on time and within budget, allowing for additional projects to improve district schools.

  • Click here for a list of Capital Improvement Projects that were completed from the $114.9 million bond levy in 2008 across the entire district.

  • Building Name Building Description Year completed
    Boring Middle School Gym, bus barn 1948
    Boring Middle School Main Building 1963
    Boring Middle School Softball shed 1968
    Boring Middle School Portable classroom 1980
    Boring Middle School Cafeteria 2020
    Boring Middle School Portable classroom 2022
    Pioneer Campus Main Building 1934
    Pioneer Campus Frasier Building 1965
    Cedar Ridge Middle, Pioneer Campus Site renovation; partial raze 2017
    Firwood Building A 1966
    Firwood Administration Main Office Building 1966
    Firwood Building B; covered playshed 1966
    Firwood Building C 1973
    Firwood Building D 1978
    Kelso Elementary School Main Building 1978
    Kelso Elementary School Portable classroom 2008
    Kelso Elementary School Well house 2008
    Kelso Elementary School Portable classroom 2015
    Kelso Elementary School Portable classroom 2020
    Kelso Elementary School Cafeteria 2020
    Naas Elementary School Main Building 1968
    Naas Elementary School Portable classroom 2019
    Sandy Grade School Main Building 1931
    Sandy Grade School North wing 1953
    Sandy High School Stadium bleachers 1966
    Sandy High School Stadium concessions, storage 1973
    Sandy High School Community Connections bldg 1983
    Sandy High School Stadium ticket booth 1995
    Sandy High School Main Building 2012
    Sandy High School Two greenhouses; pole bldg 2012
    Sandy High School Ball fields turf 2012
    Sandy High School Dugouts, concession, restrooms 2012
    Sandy High School Stadium; field/track 2012
    Welches Middle School Main Building 1968
    Welches Middle School Bus barn 1978
    Welches Elementary School Main Building 1980

     

     

  • The Oregon Trail Community has a history of supporting its local schools. 22 years ago, in 2002, voters approved a $1.95M bond to help mitigate the deterioration of school facility systems district-wide.

    Issues addressed with the bond funds included roof repairs, fire alarm system upgrades, exterior dry rot replacement, electrical system upgrades and more.

    Projects were ranked for health and safety considerations and were monitored by a citizens’ oversight committee.